Client: South Lanarkshire Council

Value: £380,000.00

Completion: October 2015

Client

South Lanarkshire Council

Project Name

Auchengray Primary School

Project Address

Auchengray Road, Auchengray,Carnwath, Lanark

ML11 8LN

Disciplines

Mechanical & Electrical Services

Main/Principle Contractor

Morrison Construction

M&E Consultants

DSSR and South Lanarkshire Council

Programme

18 Weeks

Value

£380,000.00

Description Of Works

Auchengray Primary School serves the rural communities of Woolfords, Auchengray, Tarbrax and the surrounding areas. It is a non-denominational primary school, which provides education from P1–P7 with children then transferring to Biggar High School for S1.

The original school was built in 1870. As part of South Lanarkshire’s Schools Modernisation Programme the new building was constructed in 2015 and opened to pupils on 8th January 2016. It comprises one classroom, one break out area and a hall which is used as a canteen and for PE, assemblies and events. Meals are prepared, cooked and served on the premises. Outside there is a playground, multi-use games area (MUGA) and a grassy area which can be used during the year to enhance outdoor learning. The school continues to foster well-established links in our wider rural community.

The Mechanical & Electrical Services comprised the following:-

• Sanitary Appliances
• Above Ground Drainage
• Heating Installations
• Water Services Installations
• Ventilation / Air Conditioning Systems
• Fire Hydrants & External Services
• Building Management System
• Local electric heating units
• Electrical Containment
• Photovoltaic System Installation
• Main and sub-main cabling
• LV switchgear and distribution boards
• General lighting
• General LV Power
• Emergency lighting
• External Lighting
• Stage Lighting & Sound System Installation
• Earthing and bonding
• Lightning Protection Installation
• Structured Cabling Installations
• TV Installation
• CCTV Installation
• Access Control Installation
• Intruder Detection and Alarm Installation
• Distress Alarm Installation
• Fire Alarm System
• Period Bell System
• Aspirating Smoke Detection System Installation
• Testing and commissioning
• As fitted drawings
• O&M Manuals
• Client demonstrations & handover

The project was completed on time, within budget and to a very high standard all in compliance with the clients’ requirements.